Vegetation Surveys of Sites for Gully Remediation (NESP TWQ 2.1.4, CSIRO)
Updated: 2026-06-25
This dataset contains Vegetation and Biomass monitoring data collected for the NESP Project 2.1.4 (Demonstration and evaluation of gully remediation on downstream water quality and agricultural production in GBR rangelands). The aim of the vegetation monitoring in relation to this project is to track change in biomass and species composition over time on hillslope areas above gully erosion within control and treatment sites (treatments vary), linking to changes in downstream water quality. Data is from control and treatment gully sites on commercial grazing properties in the Burdekin being monitored as part of NESP Project 2.1.4. The data in presented in this metadata are part of a larger collection and are intended to be viewed in the context of the project. For further information on the project, view the parent metadata record: Demonstration and evaluation of gully remediation on downstream water quality and agricultural production in GBR rangelands (NESP TWQ 2.1.4, CSIRO) Monitoring of these sites is continuing as part of NESP TWQ Project 5.9. Any temporal extensions to this dataset will be linked to from this record. BOTANAL files describe the biomass, species composition and species attributes such as basal area and cover for hillslope areas above gully erosion sites. PATCHKEY files describe the landscape condition (proportional) of vegetation patches for hillslope areas above gully erosion sites. And BIOMASS files describe the cover and biomass within the gully. Methods: Vegetation metrics were measured on the hillslope above each of the NESP gullies at the end of the dry season (‘EOD’, October–November) and then again at the end of the wet season (‘EOW’, April). Measurements were initiated in November 2016 at all sites except Mt Wickham which started in August 2018. Landscape and vegetation condition transects were installed upslope of the uppermost head section on both the treated and control gullies at all sites (Figure 8). Transects were run along slope contours and varied in length and spacing for each site depending on gully-head catchment size. Four to five transects were used at each treatment and control location. Each transect has a permanent marker at the beginning and end to facilitate repeat measures. Pasture metrics were recorded along each transect using a 1m2 quadrat based on the methods of Tothill et al., (1992), with placement of quadrats dependent on transect length at each site (30 quadrats were sampled for each treatment/control area). Metrics included the main pasture species and/or functional group composition and frequency, above-ground pasture biomass (DMY), total cover, litter cover, basal-area %, defoliation level and key soil surface condition metrics (Tongway and Hindley, 1995). In addition landscape condition was calculated along each transect using PATCHKEY (Abbott and Corfield, 2012). The condition assessments were aggregated to reflect ABCD landscape condition as used across grazed landscapes in the GBR catchments (Aisthorp and Paton, 2004; Chilcott et al., 2005; Bartley et al., 2014). Cover and biomass estimates were calibrated against standard quadrats taken at each site using classified quadrat photographs. Biomass standards were oven dried to attain dry matter yield, removing vegetation water retention error between treatments. A real time kinematic (RTK) survey ran from upslope of the vegetation survey to the valley section for each gully system. Gully vegetation cover and biomass were also measured within each gully, on the gully walls and gully floor. Sampling was initiated at the end of the first wet season (April 2017) for all sites except Mt Wickham which started in August 2018. The sampling methodology was very similar to the hillslope survey. A minimum of three transects were measured across each gully, representative of the head, middle and valley sections. At each transect, % cover, biomass and dominant cover type was assessed using 0.25 m2 (0.5 x 0.5m) quadrats. Three quadrats were assessed on each wall (six in total) and six quadrats assessed in the deepest part of the channel in the gully floor. Box plots of the % cover and biomass data at the end of each wet season for control and treatment sites were analysed using Sigmaplot Version 14. In most cases a t-test for means and non-parametric Mann-Whitney rank sum test were conducted to evaluate differences between treatment and control sites PATCHKEY data was collected at 5 parallel fixed transects above gully locations (hillslope area) – length and spacing of transects varied between sites dependant on hillslope size. PATCHKEY data was collected digitally using custom software on handheld android device. Survey occurs each year before and after wet season. Biomass is calibrated against cut and dried samples and cover is calibrated against classified quadrat photos – per collector. PATCHKEY is used to derive landscape condition from vegetation/grazed patches using vegetation and soil components to derive a condition state – it can be directly aggregated to match ABCD landscape condition. Condition state changes can be measured over time and related to water quality downstream. BOTANAL is a comprehensive sampling and computing procedure for estimating pasture biomass and species composition (Tothill et al 1992) – these files describe the biomass, species composition and species attributes such as basal area and cover for hillslope areas above gully erosion sites. Limitations of the data: This dataset contains Vegetation monitoring data collected at these gully sites for end of the dry season (‘EOD’, October–November) for Hillslope only and then again at the end of the wet season (‘EOW’, April) for Hillslope and Gully over three reporting periods 2016-2017, 2017-2018 and 2018-2019. Measurements were initiated in November (EOD) 2016 at all sites except Mt Wickham which started in August (EOD) 2018. Format: This data collection consists of 3 zip files each monitoring period. Each zip file contains 4 CSV files and one Microsoft Excel file: Two BOTANAL CSV files – 1 EOD and 1 EOW, Two PATCHKEY CSV files – 1 EOD and 1 EOW End of Wet season Gully_veg measurements are stored by season as Microsoft Excel file. Individual tabs for each site record the raw data as captured in the field. The “Stnds” tab calculated the calibration from BIO code to actual biomass. The “all_for_stats” sheet is the intermediate sheet for collation of data in “Wall” and “Channel” sheets ready for analysis in stats package. “Summary” tab contains summary data for the report. Data Dictionary: BOTANAL CSV headers: ID: Unique identifier for sample USER: Collector name/initials SITE: Site name (abbreviation) TRAN: Transect number (numbered from nearest to gully) QUAD: Quadrat number per transect (numbered from left side – looking downhill) DATE: Date and time SP1 to SP5: Species name abbreviated using first two letters of genus and first three of species name eg. Bothriochloa pertusa = boper. Species recorded in order of highest biomass represented. SPP1 to SPP5: Species proportion by weight of quadrat for each of species 1 to 5 YIELD: Total biomass estimate for quadrat in kg/ha DEFOL: Estimated cattle defoliation of the pasture within quadrat. Categorical – 1=0-5%, 2=5-25%, 3=25-50%, 4=50-75% and 5=75-100% BASAL: Estimated basal area of Perennial tussock grasses. % of quad COVER: Foliage projected cover % of quad LITTER: Litter cover % of quad BARE: Bare ground % of quad (optional) HARD: Soil hardness (after Tongway et al – landscape functional analysis). Categorical – 1=Easily broken, 2=Moderately hard, 3=Very hard, 4=Sand, 5=Self mulching. DEPOS: Deposition from erosion processes, Categorical – 1=Insignificant, 2=slight, 3=moderate, 4=extensive INCORP: Litter incorporation into soil surface. Categorical – 1=nil, 2=low, 3= moderate, 4=high EROSION: Categorical – 1=Insignificant, 2=slight, 3=moderate, 4=extensive COMMENT: Any comments about individual quadrat sample. PATCHKEY CVS Headers: ID: Unique identifier for sample RECORDER: Collector name/initials SITE: Site name (abbreviation) TRAN: Transect number (numbered from nearest to gully) PATCH_NO: Number of the patch occurring along a transect DATE: Date and time DOMINANT: Dominant vegetation functional group within a patch. See manual for categories BASAL: Estimated basal area of Perennial tussock grasses. % of quad LITTER: Litter cover % of quad YIELD: Total biomass estimate for quadrat in kg/ha WOODY: Presence of woody regrowth BARE: Bare ground % of patch EROSION: Categorical – 1=Insignificant, 2=slight, 3=moderate, 4=extensive HARDNESS: Soil hardness (after Tongway et al – landscape functional analysis). Categorical – 1=Easily broken, 2=Moderately hard, 3=Very hard, 4=Sand, 5=Self mulching. INCORPORATION: Litter incorporation into soil surface. Categorical – 1=nil, 2=low, 3= moderate, 4=high PATCH_TYPE: Patch type classification auto-calculated in software from inputs PATCH_EST: Patch type estimated by user – overrides calculated value LAT: Latitude – if used with differential GPS can auto calculate patch length (optional) LON: Longitude - if used with differential GPS can auto calculate patch length (optional) PATCH_LENGTH: Measured patch length along transect ACC: Accuracy of GPS coordinates COMMENT: Any comments about individual patch samples Fieldnames used in Gully_Veg XLSX spreadsheets: Date – date of measurement Quad – quadrat measured (not always numbered) Loc – location on gully –cross sections from RTK. Numbers are in order from 1 nearest incrementing by 1 downstream Pos – walls (left bank (lb), right bank (rb)) or channel BIO – biomass code from 0 to 5 – this is a surveyor-specific estimate which is calibrated to actual biomass using standards Cov – estimate of percent cover Sp – species composition COMMENT – any comments relating to the quadrat or measurement Biomass (kg/ha) – biomass calculated using standards Surveyor – surveyor number (different standards calibration required for different surveyors) References: Bartley, Rebecca; Hawdon, Aaron; Henderson, Anne; Wilkinson, Scott; Goodwin, Nicholas; Abbott, Brett; Baker, Brett; Matthews, Mel; Boadle, David; Jarihani, Ben (Abdollah). (2018) Quantifying the effectiveness of gully remediation on off-site water quality: preliminary results from demonstration sites in the Burdekin catchment (second wet season). RRRC: NESP and CSIRO. csiro:EP184204. Baker, B., Hawdon, A. and Bartley, R., 2016. Gully remediation sites: water quality monitoring procedures, CSIRO Land and Water, Australia. Abbott BN and Corfield JP (2012) PATCHKEY – A patch based land condition framework for rangeland assessment and monitoring, BACKGROUND INFORMATION AND USERS GUIDE. CSIRO, Australia. Data Location: This dataset is filed in the eAtlas enduring data repository at: data\nesp2\2.1.4-Gully-remediation-effects
Data
- NESP TWQ Project page
- eAtlas Web Mapping Service (WMS) (AIMS)
- Project web site
- Surveys 2016-2019 spreadsheets + charts + species codes + Metadata [Zip 1.42MB]
- nesp2:QLD_NESP-TWQ-2-1-4_CSIRO_Gully-remediation_Key-localities_20190702_Property_Boundaries
- Full metadata link
- http://i.creativecommons.org/l/by/3.0/au/88x31.png
- http://creativecommons.org/licenses/by/3.0/au/
- {"title":"Demonstration and evaluation of gully remediation on downstream water quality and agricultural production in GBR rangelands - data collection (NESP TWQ 2.1.4 & NESP TWQ 5.9, CSIRO)","recordAbstract":"Five paired Control/Treatment gully sites on commercial grazing properties in the Upper Burdekin and Bowen catchments are being monitored as part of NESP Project 2.1.4 (Demonstration and evaluation of gully remediation on downstream water quality and agricultural production in GBR rangelands) (Bartley et al., 2018). \n\nThe key question being asked is: \"Is there measurable improvement in the erosion and water quality leaving remediated gully sites compared to sites left untreated?\" The monitoring approach uses a modified BACI (Before after control impact) design.\n\nThis record acts as an aggregation point for the datasets produced by NESP TWQ Project 2.1.4. for Gully Remediation at sites Meadowvale, Virginia Park, Strathbogie, Minnievale and Mt Wickham Station. These sites are located in the Burdekin Region of Queensland. The time series established in this project is being extended by NESP TWQ Project 5.9. Updated versions of this dataset will be linked to from this record when they become available.\n\nThere are two sites in the Upper Burdekin sites (Virginia Park and Meadowvale) which capitalize on previous research investments looking at rangeland management and water quality response. The Bogie (Strathbogie) and Don (Minnievale) sites are Reef Trust 2 partnership projects. Mt Wickham is a new site that is part of the Burdekin Landholders Driving Change (LDC) project.\n\n\nEach contributing datasets has been described in specific dataset records linked as child records. Datasets include Key Localities, Loads Runoff, Site Configuration and survey types, TLS Scans and Analysis, Vegetation Survey, Water Quality survey. The data can be downloaded from each of the child records."}
- {"title":"Water Quality data for sites in Gully Remediation (NESP TWQ 2.1.4, CSIRO)","recordAbstract":"This dataset contains Water Quality monitoring data collected at the project gully sites for the three reporting wet seasons 2016-2017, 2017-2018 and 2018-2019. \n\nThe data in presented in this metadata are part of a larger collection and are intended to be viewed in the context of the project. For further information on the project, view the parent metadata record: Demonstration and evaluation of gully remediation on downstream water quality and agricultural production in GBR rangelands (NESP TWQ 2.1.4, CSIRO).\n\nMonitoring of these sites is continuing as part of NESP TWQ Project 5.9. Any temporal extensions to this dataset will be linked to from this record.\n\nMethods:\n\nA description of the water quality sampling procedures for this project is outlined in Baker et al.,(2016).\n\nAn automatic monitoring station was installed at each of the treatment gullies (See Key Localities). The monitoring station recorded rainfall, stage height, turbidity and water temperature at 1-min intervals during runoff events. The station also housed an ISCO auto-sampler that collected 1-L water samples at programmed intervals across the hydrograph (samples were processed as described below). A camera was installed at the treatment sites to capture photos during runoff events.\n\nEach of the control sites were fitted with a simpler tripod monitoring station that measured rainfall, stage height and turbidity. Bulk water quality samples were collected manually after each (accessible) event using poly-pipe rocket structures. Data from both the treatment and control sites had telemetered communications to allow remote access of data.\n\nUnidata Starflow QSD ultrasonic doppler was installed above the turbidity sensor at each site in 2017. The sensor measures the velocity of particles or bubbles in the water (presumed to be the same velocity as the water) using the doppler shift between transmitted and received ultrasonic signals. The sensors are mounted facing downstream to reduce the impact of particles damaging the sensor face and debris build up on measurement. The sensors require reconfiguration from factory default settings to capture data in gully systems.\nA description of the water quality sampling procedures for this project is outlined in Baker et al., (2016). In brief, following significant runoff events that triggered the samplers, the ISCO bottles were collected and the samples were filtered and frozen if collected within 24 hours of the event. These samples were analysed for TSS and the full suite of nutrients (total nitrogen, total dissolved nitrogen, NH3, NOx, total phosphorus, total dissolved phosphorus, FRP) at the JCU TropWater Laboratory, Townsville. Samples that were not collected within 24 hours were analysed for TSS only. A sub-set of the samples collected were also sent for particle size analysis. The samples were processed on a Malvern Mastersizer which is a laser diffraction analyser with a lens range of 0.02 – 2000 µm.\n\nTelemetered data from the loggers was captured to a fileserver and subsequently extracted, checked and combined with lab sample results in Excel. The files in this data collection represent the final combined dataset of all water quality and rainfall data from each site.\nLinear relationships between TSS and TN sample concentrations and coincident turbidity data were derived for all sites (Table 6). Turbidity data was not used when (i) the instrument exceeded the instrument calibration threshold; (ii) turbidity sensor readings were erroneous due to damage or sensor malfunction, or when the sensors were buried.\n\n\nFormat:\n\nThis data collection consists of 5 zip files (one for each paired gully monitoring site). Zip files are named according to the property on which they are located. Each zip file contains six MS Excel spreadsheets representing 3 years of water quality monitoring and rainfall data for both the Control and Treatment gully sites. MS Excel files contain tabs representing the following:\nNotes\nRainfall\nStream data (Timestamp, Depth, Turbidity, Rain, Photo cnt, Velocity)\nSample Data (Timestamp, BottleNo, EventNo, SampleNo, Depth, Turbidity)\nLab Results (combined with sample data)\nChart of Stream and Sample data for the whole year and reporting\nCharts of Stream and Sample data for each flow event\n\nEach zip file contains an additional Excel spreadsheet “WQ_QA_vs_Turb_<site>.xlsx” with tabs “control” and “treatment” containing a summary of all water quality lab analyses for all years and an assessment of the quality (Quality_code) of each sample. Further tabs show the turbidity-TSS and turbidity-N relationships subsequently developed for use in discharge and load estimates. \n\nAs well as the 5 zip files, this collection contains a single spreadsheet summarising all particle size measurements for the sites: “NESP_particle size_summary_all_sites.xlsx”\n\n\nData Dictionary:\n\nColumn headings used in the Water Quality Excel spreadsheets:\nTimestamp – time in AEST (+10GMT)\nDepth – Depth of flow above depth sensor in millimetres, Depth sensor was level with gully bed at time of installation. \nTurbidity – turbidity in units of NTU\nVelocity - Velocity is in units of mm/sec\n(note that the Turbidity and velocity sensors are mounted at between 100 and 400 mm above the depth sensor).\nRain – rainfall in millimetres during period between current timestamp and previous timestamp\nPhotoCnt – site photo count value associated with timestamp\nBottleNo – Bottle number associated with ISCO sampler\nEventNo – Event number associated with sample\nSampleNo – Sample Number as submitted to Lab.\nLab Results – headings are self-explanatory \nTSS = Total Suspended Sediment\n\nColumn headings used in Particle_size sptreadsheet:\nYear – Wet season over which particle size sample was collected\nEvent - indicator to allow for differentiation between events\nSite – site at whch samples awas collected (codes below)\nDate – sample collection date\nSample number\t\nTSS – Total Suspended Sediment recorded in Stream data at sample timestamp\n<10 um\t- fraction of sample < 10 microns size\nParticle size - D10 - diameter (microns) at which 10% of the sample's mass is comprised of particles less than this diameter\nParticle size - D50 - diameter (microns) at which 50% of the sample's mass is comprised of particles less than this diameter\nParticle size - D90 - diameter (microns) at which 90% of the sample's mass is comprised of particles less than this diameter\nSource – the source of the data (name) if not CSIRO\n(Where D10,50,90 is the of < 10 micrometres).\n\nWQ_QA_vs_Turb_<site>.spreadsheets: \n“Treatment” and “Control” tabs contain Lab Results for all years at Treatment and Control gullies. An additional Quality_Code is used to assign a quality value to the Samples:\n0 = good for tss/turb relationship & concentrations\n1 = turbidity probe error - concentration data OK\n2 = turbidity probe out of range - concentration data OK\n3 = sample error (don’t use for concentrations) but turb data is OK\nThe “TSS-Turb” and “N-Turb” contain the lab results used to derived the TSS-Turb and N-Turb relationships at each site.\n\n\nSite Codes used in filenames or Site columns are as follows:\nMIN = Minnievale\nMV = Meadowvale\nMW = Mount Wickham\nSB = Strathbogie\nVP = Virginia Park\n<T/C> - Treatment/Control\nNote: \nSBT is now the Strathbogie Control site \nSBC (to 2018) and SBT2 (after 2018) is now the Strathbogie Treatment site\n\n\nReferences:\n\nBaker, B., Hawdon, A. and Bartley, R., 2016. Gully remediation sites: water quality monitoring procedures, CSIRO Land and Water, Australia.\n\nBartley, R., Hawdon, A., Henderson, A., Wilkinson, S., Goodwin, N., Abbott, B., Bake, B., Boadle, D., and Ahwang, K. (2019) Quantifying the effectiveness of gully remediation on off-site water quality: preliminary results from\ndemonstration sites in the Burdekin catchment (third wet season). Report to the National Environmental Science Programme. Reef and Rainforest Research Centre Limited, Cairns (115 pp.).\n\n\nData Location:\n\nThis dataset is filed in the eAtlas enduring data repository at: data\\NESP2\\2.1.4-Gully-Remediation-effectiveness"}