Water quality, plume modelling and tracking before and during dredging in Mermaid Sound, Dampier W.A.
Updated: 2012-08-16
A water quality monitoring program established to coincide with the Mermaid Sound dredging projects in 2004 for assessed turbidity, suspended sediments and other parameters (Dissolved Oxygen, pH, Temperature, Salinity) every three days to start then weekly. To assist in locating monitoring sites - a model of sediment transport was developed. Also throughout the dredging program aerial surveys of the dredging location, monitoring locations and surrounding areas were undertaken on a weekly basis. They were flown of the same day as the water monitoring trip to allow for cross-referencing of visual observations and actual data.
Data
- Link to Report
- Full metadata link
- {"title":"Corals of the Dampier Harbour - Their Survival and Reproduction During the Dredging Programs of 2004","recordAbstract":"MScience undertook a variety of studies for Dampier Port Authority and Pilbara Iron in response to proposals involving dredging of new berths and channels that occurred:\n\nDampier Port Authority (DPA): 8 January - 20 May 2004; and \nHamersley Iron Pty Limited (HI): 8 May - 23 October 2004 . \n\nData collected involved surveying distribution of coral species and their community structure, high-precision monitoring of coral, patterns of mortality from natural and anthropogenic influences (cyclone and dredging), water quality and investigating the reproductive status of corals in the turbid inshore marine environments of Dampier Harbour."}